ASEAN Sector 2/3 Biosecurity & BAI Compliance
Strict farm perimeter defense, 14-day downtime sanitation, vehicle tire baths, and 24h visitor quarantine log
🔄 Mandatory 14-Day Sanitary Downtime Stages (ASEAN Standard)
Between flock depopulation and next chick placement, a strict minimum 14-day fallow period is enforced.
Total Litter Evacuation & Deep Caked Bedding Removal
Evacuate all spent litter, take outside perimeter in covered trucks, scrape concrete slab.
Dry Cleaning, Ceiling & Fan Dust Blowdown
Air-compressor / leaf blower cleaning of trusses, curtains, fans, wire mesh, and feed pans.
High-Alkaline Foaming Detergent Application
Apply active degreaser foam across walls, ceilings, slats, and cooling pads to dissolve bio-films.
High-Pressure Hot/Cold Water Rinse (2500 PSI)
Flush all chemical residues, clean drains, descale cooling pad reservoir and water pipes.
Broad-Spectrum Disinfectant Spray & Misting
Apply Glutaraldehyde + QAC or Potassium Peroxymonosulfate (Virkon-S) at 1:100 concentration.
Thermal Fogging / Fumigation & 24h House Sealing
Thermal fog with formaldehyde or dry fogging biocide; seal curtains and doors for minimum 24 hours.
Fresh Rice Hull Bedding & Equipment Reassembly
Spread 8-10 cm kiln-dried rice hulls / wood shavings; lower feed lines and sanitize drinker cups.
Brooder Pre-Heating (33°C), Static Pressure & Water Test
Pre-heat 24h before chick arrival, test backup generator, check chlorination (3 ppm).
📋 Chemical Footbath Guidelines
PNS/BAFS standards for commercial broiler house entry footbaths
Recent Biosecurity Audit Logs
6 Inspections Logged| Date | Inspection Type | Target Location | Inspector | Chemical / Details | Status | Notes |
|---|---|---|---|---|---|---|
| 2026-08-25 | vehicle wheel spray | Main Perimeter | Guard J. Morales | Glutaraldehyde + QAC (Omnicide 20%) | pass | Feed delivery truck cleared through tire bath |
| 2026-08-25 | visitor quarantine log | Main Perimeter | Security Team | Potassium Peroxymonosulfate (Virkon-S) | pass | Routine BAI biosecurity compliance audit inspection |
| 2026-08-25 | footbath recharge | House H-01 | Supervisor Arnel | Potassium Peroxymonosulfate (Virkon-S) | pass | Daily 8:00 AM footbath recharge at House 1 entry ante-room |
| 2026-08-25 | footbath recharge | House H-02 | Supervisor Ramon | Potassium Peroxymonosulfate (Virkon-S) | pass | Footbath recharged at House 2 entry |
| 2026-08-25 | water chlorination test | Main Perimeter | Farm Chemist L. Cruz | Sodium Hypochlorite 12% | pass | Waterline ORP 740 mV indicates pathogen-free drinking water |
| 2026-08-19 | downtime sanitation 14day | House H-03 | Biosecurity Officer Mark | TH4+ Multi-action Disinfectant | pass | Downtime Day 8 of 14 completed successfully for House 3 |